ROI Calculator
Bolt Star® vs. Wood Template — Real Cost Analysis
Project Parameters
Range: 1 – 100
Enter a value between 1 and 100
Range: 2 – 30
Enter a value between 2 and 30
$
Range: $30 – $100/hr (whole numbers)
Enter a value between 30 and 100
Range: 1 – 20
Enter a value between 1 and 20
Select tube size (determines Bolt Star unit price)
Results
Wood Template
Labor
@ $30/hr × 225.0 hrs
$6,750.00
Materials
$20.00/base × 100 bases
$2,000.00
Total Cost
$8,750.00

Labor
@ $30/hr × 100.0 hrs
$3,000.00
Bolt Star Units
$95.00/unit × 10 units
$950.00
Total Cost
$3,950.00
Total Savings with BOLT STAR®
vs. traditional wood template method
$4,800.00
Savings per Base
$48.00
per pole base
Labor Hours Saved
125.0
total hours
Bolt Star Units Needed
10
reusable units
Calculation Assumptions
- 45 minutes to build and install each wood template (per crew member)
- 20 minutes to set up and install Bolt Star (per crew member)
- Wood template material cost: $20.00 per base (single use)
- Bolt Star units are reusable — quantity needed = bases poured per day
Cost savings with the Bolt Star tool are an estimate for illustrative purposes only. Actual results may vary depending on job specifications or your company’s business economics. The calculator assumes 45- minutes to build and setup each wood template, compared to only 20-minutes using a Bolt Star tool. The cost of wood template materials is an average estimated cost. commodity prices of materials are known to vary by region of the United States. All figures are shown in U.S. dollars